Shipping from Khorgos to Tehran, Iran

Chinrah coordinates overland freight from the Khorgos gateway in western China to Tehran, along the Central Asian corridors that link the two countries.

  • Road freight · FTL & groupage
  • Cross-border transit
  • Rail on request
  • Tehran delivery

Route, border crossing and vehicle are confirmed per shipment. The corridor shown below is illustrative.

Route overview

Khorgos to Tehran at a glance

A land corridor from the China–Kazakhstan border to Iran's inland capital, by road and by rail.

Origin
Khorgos, China
Origin note
China–Kazakhstan border gateway
Destination
Tehran, Iran
Destination note
Inland customs and delivery
Main transport
Road freight
Cargo options
Full trailer / groupage
Transit region
Kazakhstan · Uzbekistan · Turkmenistan
Alternative
Rail, subject to route confirmation
Containers and freight vehicles at a land border terminal
Containers waiting at the China–Kazakhstan gateway before the onward haul west.

The gateway

Khorgos, where China meets Central Asia

Khorgos is the dry port on the China–Kazakhstan border where most overland China–Iran cargo begins.

Cargo collection in China

We collect from the supplier, warehouse or consolidation point agreed in the booking, then move the cargo by road or domestic rail toward Xinjiang.

China export declaration

The export declaration, packing list and cargo data are filed at the Khorgos or Altynkol customs point before the vehicle or wagon crosses.

Border handover

Rail gauge changes from 1,435 mm to the 1,520 mm network at Khorgos or Altynkol; road cargo is changed to a Kazakh trailer or trans-loaded.

Aerial view of container trucks queued at a border freight terminal
Container trucks waiting their turn at a land frontier — the queue is part of the transit time.

We coordinate operations at Khorgos through the carrier and the local agent; the gateway is not our own terminal.

The corridor

From Khorgos through Central Asia to Tehran

One corridor, several frontiers. The crossing points below are the ones normally used, not the only ones.

ChinaKhorgosAltynkolAlmatyTashkentTurkmenistanTehranIranKhorgosChinaAltynkolKazakhstanAlmatyTashkentTurkmenistanTehranIran
Schematic overland corridor: Khorgos · Altynkol · Almaty · Tashkent · Turkmenistan · Tehran. Illustrative only.

The corridor scrolls sideways on a narrow screen.

What we confirm before booking

  • The border crossing and the transit countries on your route
  • Vehicle or wagon type, payload and loading method
  • Transit permits and the documents each country requires
  • The Iranian entry point and the destination customs terminal
  • Collection address in China and delivery address in Tehran
  • A reference transit time for the confirmed arrangement

The corridor above is a schematic. The operator, the frontier and the stop sequence are fixed per shipment, never per lane.

Freight train with containers on a rural line
Containers on the rail leg — one of the arrangements we evaluate against trucking.

Transport options

Road, rail or a combination

Road is the working option on this corridor. Rail is quoted when the wagon and the route are confirmed.

Road freight

Primary option

  • Full trailer for one consignee
  • Groupage for smaller consignments
  • Curtain-side, box or containerised trailers
  • TIR transit through Kazakhstan and Turkmenistan
Priced per trailer or per chargeable kg

Rail freight

Subject to confirmation

  • Wagon groups and block-train space
  • Gauge change at Khorgos or Altynkol
  • Container and wagon-load cargo
  • Terminal-to-terminal or with a road leg
Quoted per shipment on the confirmed route

Combined transport

Shipment specific

  • Road collection to the rail terminal
  • Rail across Central Asia
  • Road delivery after the Iranian border
  • Planned around cargo size and deadline
Quoted per shipment once the route is agreed

We only quote a mode we can actually book for your cargo. If rail space is not confirmed, the quotation says so.

Transit time

How long freight takes from Khorgos

Three stages, each with its own queue. The total is what we quote, not the driving time alone.

1–3 days

Border and export

Export declaration, inspection at the Chinese side and the handover to the Kazakh carrier.

6–9 days

Central Asian transit

The haul through Kazakhstan, Uzbekistan and Turkmenistan, with transit papers at each frontier.

3–4 days

Iran entry and delivery

Iranian border formalities, clearance at the Tehran terminal and delivery to the agreed address.

Transport optionReference transitTime basis
Road freight10–14 daysKhorgos gateway to Tehran delivery
Rail freight12–18 daysKhorgos rail terminal to Tehran terminal
Combined transport14–20 daysRoad and rail on a confirmed route
Ranges, not schedules

Border queues, winter weather on the Kazakh steppe and wagon availability move these figures. The transit estimate is confirmed with the quotation.

Times count from the Khorgos gateway. Add 3–7 days for collection in eastern or southern China.

Cargo

What moves on this corridor

General commercial cargo, machinery and project lots — subject to carrier acceptance and the permits each border asks for.

Machinery and equipment

Production machinery, spare parts and industrial equipment, crated for overland handling.

Automotive parts

Components, tyres and accessories for assembly and after-sales supply.

Building materials

Profiles, panels, sanitaryware and fittings, palletised or in bundles.

Consumer goods

Household products, appliances and general merchandise for the Iranian market.

Textiles and fabrics

Rolls, bales and finished garments, often consolidated from several suppliers.

General cargo

Toys, stationery, hardware and mixed consignments on a groupage basis.

Loading options

  • Curtain-side trailer, 13.6 m — about 20–22 t or 80 CBM
  • Box trailer for weather-sensitive cargo
  • Containerised transport, 20GP or 40HQ
  • Flatbed or lowbed for approved project cargo
What we cannot load as booked

Dangerous goods, chemicals, batteries, dual-use equipment and goods without export or import permits need a separate check before we quote. Counterfeit goods are never carried.

Cargo is reviewed for dimensions, weight, packaging and restrictions before the vehicle is fixed.

Cost

What drives the freight cost

Seven factors decide the number. We price the arrangement, not a published per-kilo rate.

Weight and volume

Gross weight, dimensions and the loading volume the cargo actually fills.

Chargeable weight

Road freight bills on the greater of actual weight and volume at 1 CBM = 250 kg.

Loading type

A full trailer, a groupage slot or a container changes the pricing basis.

Route and frontiers

Transit countries, frontier fees and the permits each of them issues.

Documentation

TIR carnet, transit declarations and customs brokerage along the way.

Iran entry and clearance

Border handling, import duty and the clearance service you take.

Tehran delivery

Terminal handling or door delivery, plus waiting and unloading time.

What we need to price it

  • Total gross weight
  • Volume in CBM and package dimensions
  • HS code for each product line
  • Cargo ready date and pickup address

The quotation states what is included, what is excluded and which charges are still to be confirmed at destination.

Get a Khorgos to Tehran quote

How it works

From enquiry to delivery in Tehran

Six steps, one coordinator, and a report at every frontier the cargo crosses.

  1. 01

    Shipment review

    Cargo, weight, volume, origin, destination and deadline — we check what the corridor can take.

  2. 02

    Collection in China

    Pickup at the supplier or warehouse and linehaul to the Khorgos logistics area.

  3. 03

    Chinese export customs

    Export declaration filed and the cargo released for the border crossing.

  4. 04

    Cross-border transit

    The vehicle or wagon moves through Kazakhstan and Turkmenistan on the confirmed transit papers.

  5. 05

    Iran entry and clearance

    Formalities at the Iranian frontier, then clearance at the Tehran customs terminal.

  6. 06

    Delivery in Tehran

    Handover at the terminal or delivery to the consignee, whichever the quotation covers.

One coordinator follows the shipment from pickup to delivery and reports at each border, not only at the end.

Customs and documents

Papers for three kinds of frontier

Export in China, transit through Central Asia, import in Iran — three different sets, one file.

China export

  • Commercial invoice
  • Packing list
  • Export customs declaration
  • Product certificates or permits where required

Road and transit

  • CMR consignment note, where applicable
  • TIR carnet for the confirmed operation
  • Transit declaration for each country
  • Vehicle and driver documents

Iran import

  • Commercial invoice and packing list
  • Transport document
  • Import permit or product certificate where required
  • Any further document Iranian customs requests
Freight documents and a customs declaration on a desk
The export, transit and import file is checked before the cargo leaves China.

Checks before dispatch

  • HS code and cargo description agreed with the importer
  • Import permission verified before the truck loads
  • Parties screened against sanctions lists
  • Transit rules of each country on the route checked
  • Exporter, carrier and importer responsibilities written into the booking

CMR and TIR apply only when the operation qualifies. The document set is confirmed per shipment with the carrier and the customs broker.

Delivery

Where the cargo stops in Tehran

Two delivery levels, priced differently. Tell us which one the quotation should cover.

Customs terminal

Release point

Cargo is handed over at the nominated terminal or bonded facility in Tehran once it is released.

Warehouse or door

Final address

Onward trucking to the consignee, arranged after release and confirmation of the address and access.

Common destinations in Tehran

  • Tehran West Customs (Gharantineh)
  • Aprin Dry Port
  • Consignee warehouse in any Tehran district
  • Another Iranian city, on request
Tehran city skyline with the Alborz mountains behind
Tehran — the cargo is not delivered until it is released and moved to the agreed point.

Destination points are options for the quotation. Whether we handle clearance or delivery there is confirmed per shipment.

Border coordination

Five frontiers, one plan

The hard part of this lane is not the driving. It is the handover at each frontier.

  1. China export

    Declaration, licence checks and the release that lets the cargo leave the country.

  2. China–Kazakhstan handover

    Khorgos or Altynkol: gauge change for rail, trailer change or trans-loading for road.

  3. Central Asian transit

    Kazakhstan, Uzbekistan and Turkmenistan transit declarations, each with its own inspection.

  4. Iran entry

    Sarakhs or Incheh Borun formalities, handled with the carrier's Iranian agent.

  5. Tehran clearance

    Import declaration, duty payment and release at the destination terminal.

Each frontier is a separate procedure with its own documents and its own queue. We plan the transit time that way, not as one continuous drive.

Why Chinrah

Why shippers use us on this corridor

Not because we own trucks in Kazakhstan, but because we know what each border asks for.

One corridor, one contact

The same coordinator from the Chinese pickup to the Tehran handover, in your time zone.

Route planned per shipment

Frontier, vehicle and transit time chosen for your cargo, not copied from a rate sheet.

Documents checked first

HS code, permits and sanctions screening happen before the truck is loaded, not at the border.

Scope written into the quote

Included, excluded and to-be-confirmed charges are listed, so the invoice matches the quote.

Ask for a route review

Send the cargo details and we confirm the corridor, the vehicle and the documents.
Ask for a route review

FAQ

Khorgos to Tehran questions

The things importers ask before they book this corridor.

What is the Khorgos to Tehran route?
An overland corridor from the China–Kazakhstan border through Central Asia into Iran. A common sequence is Khorgos, Altynkol, Almaty, Tashkent and Turkmenistan before the Iranian frontier, then Tehran. The confirmed route depends on the carrier and the cargo.
How long does road freight take?
Reference time is 10–14 days from the Khorgos gateway to Tehran delivery. Collection deeper inside China adds 3–7 days. Border queues and winter weather can extend it, so the estimate is confirmed with the quotation.
Which countries does the cargo cross?
Normally Kazakhstan, Uzbekistan and Turkmenistan before Iran. The exact sequence and the frontier used are confirmed per shipment, and the corridor map on this page is schematic.
Can I ship a full trailer?
Yes. A curtain-side trailer carries about 20–22 tonnes or 80 CBM depending on the cargo. Heavier or oversized lots are quoted on flatbed or lowbed equipment, subject to carrier acceptance and road restrictions.
Can smaller shipments use this corridor?
Groupage is available, billed on chargeable weight at 1 CBM = 250 kg with a minimum. Consolidation departs when the container or trailer is full, so the schedule is less fixed than for a full trailer.
Which documents are needed?
Commercial invoice, packing list, export declaration and the transport document, plus transit declarations for each country crossed and the Iranian import permit or product certificate where the goods require one.
Does the cargo enter Iran through Sarakhs?
Sarakhs is one of the crossings used on this corridor; Incheh Borun is another. The entry point is decided by the carrier and the confirmed route, and it is stated in the quotation.
Can you deliver to my warehouse in Tehran?
Yes, when the quotation includes door delivery. Clearance must be completed first, and the address, access and unloading arrangements are confirmed before the local truck is booked.
What cargo is not accepted?
Counterfeit goods, dual-use equipment without licences, and dangerous goods without a compliant declaration and permits. Batteries, chemicals and machinery with controlled components are checked case by case.
How do I get a quote?
Send the cargo description, HS code, gross weight, volume, package count, pickup address in China and the destination in Tehran. We confirm the corridor and the vehicle, then quote the scope in writing.

Quote

Get a Khorgos to Tehran quote

Cargo details in, a corridor and a price out — usually within one working day.

Route: Khorgos, China → Tehran, Iran · Land freight

Quote this lane

Road freight · FTL & groupage · Cross-border transit · Rail on request · Tehran delivery