International rail connectivity
Xi'an runs scheduled block trains to Central Asia and Europe, and its terminal connects with the wider China Railway network.
China–Iran rail freight
Chinrah coordinates international rail freight from Xi'an's dry port to Tehran — container loading, corridor booking, cross-border documents and arrival handling.
Departure station, corridor and equipment are confirmed per booking. The corridor below is illustrative.
Route overview
An inland rail gateway in central China, a container train across Central Asia, and an inland destination in Iran.

Why Xi'an
Xi'an connects China's manufacturing base to the Central Asian rail network — without a sea leg.
Xi'an runs scheduled block trains to Central Asia and Europe, and its terminal connects with the wider China Railway network.
Cargo is received, checked and loaded into containers at the terminal, subject to terminal and carrier requirements.
Goods from Shaanxi, Henan, Gansu and other provinces can be trucked or railed to Xi'an for one consolidated departure.
Rail sits between ocean and air freight on cost and transit time, and avoids the long sea leg to Bandar Abbas.

We book the confirmed departure station and train service. Cargo from other cities is collected to Xi'an only when the schedule allows it.
Rail route
One corridor through Khorgos and Central Asia, with a gauge change and several frontiers on the way.
The corridor scrolls sideways on a narrow screen.
The corridor above is schematic. Interchange points and the Iranian frontier are fixed per shipment, never per lane.

Rail freight solutions
What we can arrange depends on volume, container equipment and the space the operator releases.
Per container
Subject to confirmation
Scope option
Rail groupage is not a fixed product on this lane. We review the cargo and tell you whether a consolidated container is realistic before quoting.
Transit time
Three stages, each with its own queue. The total is what we quote, not the train's running time alone.
Cargo receiving, container loading, export declaration and terminal procedures before departure.
The westbound run through Khorgos and Kazakhstan, the gauge change and transit formalities at each frontier.
Arrival at the Iranian terminal, import clearance and onward delivery to the agreed address.
| Transport option | Reference transit | Time basis |
|---|---|---|
| Rail — door to door | 18–25 days | Xi'an collection to Tehran delivery |
| Rail — terminal to terminal | 16–22 days | Xi'an terminal to Tehran terminal |
| Rail plus road delivery | 18–26 days | Terminal arrival plus inland trucking |
| Truck alternative | 15–22 days | Full trailer, when rail space is unavailable |
Departure frequency, border queues, gauge transfer and wagon availability move these figures. The transit estimate is confirmed with the quotation.
Add 3–7 days when cargo has to be collected deeper inside China and consolidated at Xi'an.
Cargo and equipment
Containerised commercial and industrial cargo, subject to rail acceptance rules and Iranian import requirements.
Production machinery, spares and tooling, crated and secured for rail handling.
Components, tyres and accessories for assembly lines and after-sales supply.
Rolls, bales and finished garments, often consolidated from several suppliers.
Household products, appliances and general merchandise for the Iranian market.
Motors, cables, fittings and components, packed against vibration and moisture.
Hardware, stationery, toys and mixed consignments on a groupage basis.
Batteries, chemicals, dangerous goods, temperature-sensitive products, oversized equipment and dual-use items require an additional review before booking. Counterfeit goods are never carried.
Send the product description, HS code, package dimensions and gross weight for a preliminary acceptance check.
Cost
Rail pricing is built from the container, the corridor and the destination service — not a single per-kilo figure.
A 20GP, 40HQ or another available unit changes the base rate.
Rail bills the greater of actual weight and volume at 1 CBM = 200 kg.
Dense, awkward or over-height cargo needs a different loading plan.
Transit countries, border fees and the permits each one issues.
Space released by the operator in peak season is priced accordingly.
Import duty, terminal handling and the customs service you take.
Terminal handover or door delivery, plus waiting and unloading time.
The quotation separates freight, origin charges, destination charges and duties, and marks anything still to be confirmed.
Get a Xi'an to Tehran quoteHow it works
Six steps, one coordinator, and a report at every frontier the cargo crosses.
Product, HS code, weight, volume, package dimensions and the delivery address.
We check cargo acceptance, corridor options, container needs and the space available.
Delivery to the terminal or our warehouse, checking, packing and loading as booked.
Export declaration, container sealing and terminal handover to the confirmed train.
The shipment moves on the booked corridor, with transit formalities at each frontier.
Terminal handling, import clearance and onward delivery as agreed.
The sequence can change with the service selected, the cargo and Iranian clearance requirements.
Customs and documents
Export in China, transit through Central Asia, import in Iran — three sets, one file, checked before loading.

Clearance is subject to the Iranian authorities and the importer's eligibility. We describe only the clearance we can actually coordinate through verified partners.
Tehran arrival and delivery
Rail arrival is not delivery. The container must be released and moved before it reaches your warehouse.
Terminal
We confirm the arrival terminal, the release requirements and the handling charges before the train lands.
Import file
Documents go to the importer or the authorised broker; duty and release follow Iranian procedure.
Door
Onward trucking to the agreed address once the container is released.

Terminal, customs arrangements and delivery options are confirmed before shipment — not assumed from the lane.
Mode comparison
The right mode depends on volume, deadline and cargo value. Here is how the three compare.
| Criterion | Rail freight | Sea freight | Air freight |
|---|---|---|---|
| Route | Xi'an to Tehran via Central Asia | Chinese port to Bandar Abbas | Chinese airport to Tehran IKA |
| Best for | Containerised commercial and industrial cargo | Large volumes with a flexible deadline | Urgent or high-value cargo |
| Cost basis | Per container or chargeable kg | Per container or per CBM | Per chargeable kg at 1:167 |
| Reference transit | 18–25 days door to door | 25–32 days FCL | 5–8 days door to door |
| Trade-off | Fewer departures, inland destination | Long sea leg and port handling | Highest cost per kilo |
Rates and schedules move. We compare the live options for your cargo rather than quoting a table.
Before you book
Most delays on this corridor start with a document or an acceptance question, not the train.
We run these checks with you before the booking is placed.
Why Chinrah
Route knowledge and document discipline, not a promise of our own trains.
We compare rail, road and sea for your cargo and recommend the arrangement we can actually book.
Container type, loading method and documents are chosen for the goods, not for a template.
One coordinator tracks the file from export declaration to Iranian release.
The Tehran delivery address shapes the corridor, the terminal and the clearance plan.
Ask for a route review
Send the cargo details and we confirm the corridor, the equipment and the documents.FAQ
The things importers ask before they book this corridor.
Rail quote
Send the cargo details and we confirm the departure, the container and the delivered scope.
China–Iran rail freight · FCL container options · Rail corridor coordination · Tehran arrival & delivery